Stem, North Carolina (27581) · Butner, North Carolina (27509) · Creedmoor, North Carolina (27522) · Oxford, North Carolina (27565) · Franklinton, North Carolina (27525) · Youngsville, North Carolina (27596) · Durham, North Carolina (27701) · Wake Forest, North Carolina (27587) · Hillsborough, North Carolina (27278) · Henderson, North Carolina (27536) · North Raleigh, North Carolina (27614, 27615).

Make each item specific

Record the building and suite, room or grid location, item description, dated photo, trade, priority and person who reported it. Describe the observable problem: for example, a door does not latch or a finish is damaged at a marked location. Avoid a single line such as 'finish all work' that cannot be checked.

Separate a correction to the agreed work from a newly requested improvement. Ask the project decision-maker to classify disputed items against drawings, specifications, change records and lease or work letter before dispatching a crew.

Group work without hiding dependencies

Group related items by trade and access window, then note sequencing: a ceiling patch may wait for a mechanical inspection; painting may wait for a wall repair. Identify occupied rooms, restricted hours, security badges, elevator/loading access and protection of existing tenant operations.

Flag a life-safety, active leak or other immediate hazard for the building's responsible professional. A general finish punch crew should not be assumed to accept regulated or emergency work.

Request a checkable quote

Ask bidders to identify accepted item numbers, labor and materials, trade exclusions, access assumptions, permits or inspections if applicable, change procedure, cleanup, photo evidence and return-visit terms. Compare the same list revision and the same boundary of work.

AIA describes a punch list as items remaining to be completed or corrected around substantial completion. The actual contract controls who prepares, verifies and closes the list; this page does not decide contractual responsibility.

Common questions

What should I send with a punch-list request?

A dated numbered list, locations and photos, approved scope documents, site access rules, desired sequence and the person authorized to approve changes.

Can one contractor handle every open item?

Only if that contractor accepts the required trades and any licensing, permit and inspection obligations for the actual location.

Is a punch list the same as a new build-out?

No. First separate corrections to existing agreed work from added work and obtain authorization for each scope.